Categories
Civic
Location
San Diego, CA
Size
924,200 SF
Status
Completed 2018
Client
San Diego Regional Airport Authority
SDIA Terminal 2 Parking Plaza
The terminal 2 parking plaza was redesigned for the San Diego International Airport with a focus placed on convenience for visitors and protection of the environment. More parking spaces and new EV charging stations were added, along with technology to guide in more efficient parking. Environmental benefits include reduced air emissions (quicker parking) and reuse of water, which consequently prevents runoff from entering San Diego Bay (captured in underground stormwater system). Visitors are also welcomed by an aesthetic design with open light wells, glass-front elevators, and public art.